Project Overview
We were hired to fully strip out a warehouse in an industrial property in London as part of a larger redevelopment and change-of-use project.
Our goal was to clear out all non-structural parts, unused services, and excess installations, leaving a clean, safe space ready for refurbishment.
Because the building was large and had existing plant and mezzanine structures, we needed to plan carefully and execute the work with attention to detail.
Scope of Works
Our warehouse strip-out works included:
- Dismantling and removal of mezzanine flooring
- Removal of internal offices and partitioned areas
- Decommissioning and removal of mechanical and electrical services
- Removal of racking systems and ancillary installations
- Isolation and safe removal of redundant plant
- Waste segregation and controlled disposal
We carried out all work in accordance with the agreed methods and site safety requirements.
Key Project Considerations
Warehouse strip-outs often present logistical and safety challenges due to building size, limited access, and the volume of materials involved. We carefully managed:
- Safe dismantling of elevated mezzanine structures
- Controlled removal of heavy materials and equipment
- Traffic management for plant and vehicle movement
- Coordination of waste removal to maintain clear working areas
- Protection of retained structural elements
Our organised approach helped the work move forward efficiently and maintain high safety standards.
Our Approach
Before starting, we reviewed the site to assess the structure, service isolation points, and access to the building.
The project was delivered through:
- Detailed sequencing of dismantling works
- Experienced in site supervision and coordination
- Clear communication with the client and wider project team
- Ongoing monitoring of health and safety controls
By maintaining control of logistics and workflow, we ensured the strip-out phase remained aligned with the overall redevelopment programme.
Outcome
We handed over the warehouse with all old installations removed, safely stripped back to its structure and ready for the next stage.
We finished the project on schedule, delivering a clean, compliant space ready for refurbishment and reconfiguration.