Soft Strip Demo Project London

Overview

Location:

London

Type of Contractors:

Main

Timeline:

2 weeks

Summary:

soft-strip-demolition10.jpeg

Project Overview

We took on a soft-strip demolition project at a commercial property in London, preparing the building for a full internal refurbishment.
Our goal was to remove all non-structural elements safely and efficiently, protect the building fabric, and ensure compliance with all site and landlord requirements.
This work was the first step in a larger redevelopment, so we planned the sequence carefully to keep everything on schedule.

Scope of Works

Our soft strip demolition works included:
  • Removal of internal partitions and glazed systems
  • Strip out of suspended ceilings and floor finishes
  • Disconnection and removal of mechanical and electrical services
  • Removal of fixtures, fittings, and built-in joinery
  • Careful protection of retained structural elements
  • Waste segregation and responsible disposal
We followed the agreed method statements and health and safety procedures throughout the job.

Project Challenges

The building was empty during our works, but its location in a busy part of London meant we had to manage access, logistics, and waste removal carefully to avoid disrupting neighbours.
Key considerations included:
  • Controlled access and loading arrangements
  • Dust and noise management
  • Safe isolation of existing services
  • Protection of retained areas
We worked closely with the client and project team to keep the work moving smoothly and avoid delays.

Our Approach

Before starting, we reviewed the site in detail to assess access routes, service locations, and the best sequence for the works.
The project was delivered through:
  • Clear planning and programme alignment
  • Experienced site supervision
  • Strict adherence to RAMS
  • Ongoing communication with the client
We finished the soft strip safely and on time, leaving the building clean and ready for the next phase of refurbishment.

Outcome

We handed over the project as planned, giving the client a fully stripped space ready for structural changes and fit-out, and carefully managing the soft-strip demolition phase, we helped reduce risk and set the foundation for a successful redevelopment programme.