Why Is Soft Strip Out Important Before Demolition?

strip out contractors

Demolishing means bringing down the entire building, including its internal elements. However, soft strip demolition is different. It protects old building materials that are in good condition. The process is most beneficial if you plan to renovate your old building. But how can soft strip demolition help you demolish an old building? Do you need to follow specific steps to soft strip demolition? Read on to know all the answers in the next part of the discussion. A soft strip-out process carefully removes non-structural elements from a building without damaging the structure. This process has plenty of benefits if you plan on demolishing the building.

Key takeaways

The soft strip demolition process is a sustainable approach to removing non-structural elements from your building. It has become a popular choice for preparing your building for demolition.

With the soft strip-out process, you can recycle old building materials. This is a sustainable process, as you can utilise the Reduce, Reuse, and Recycle approach while renovating an old building.

When you go out for a Soft Strip demolition, You survey the site thoroughly when you go for a soft strip-out demolition. This allows you to find structural decay or hazardous elements in the property. As a result, workers are better protected against hazardous materials in the building.

Soft strip demolition

It is an essential pre-demolition step that you must do to prepare the sight for further demolition. Speaking of demolition, you might think of large machinery, jackhammers, and excavators, but soft-strip-out demolition does not require such equipment. A professional soft strip contractor carefully removes decorative and architectural elements of your building, which might include:

Ceilings, Carpets, Electrical wiring and equipment, Internal concrete walls, and Staircases .

You might call the soft strip-out process sustainable because it recycles and reuses old materials. The result is that you don't produce much waste material from the demolition of your building. You will also have limited requirements for new building resources made of natural elements.

What are the advantages of soft strip demolition?

If you plan to demolish the old building, you miss the chance to salvage old materials in good condition. Unfortunately, you waste a lot of materials that could have been recycled. You can recycle old materials and use them in the next construction phase. Consequently, you will have a building with a low carbon footprint. Soft strip-out service also helps you cut the renovation cost and be more sustainable in building construction and renovation. For example, you can reuse old carpets, window frames, doors, etc.

How can soft strip demolition help preserve resources and reduce environmental impact?

As discussed in the above section, a soft strip-out process can help you reduce demolition waste. You preserve building materials as much as possible. The cost of construction in the UK increased after the COVID-19 impact. It continued to increase its cost between 2021 and 2023. Think how much it benefit you economically as well, if you could save on reducing the requirement of new materials. Similarly, requiring fewer resources means using fewer natural resources. Ultimately, you help protect the environment, even if only a little bit.

What steps of soft strip demolition can you adopt before demolishing a building?

Following specific steps to conduct a soft strip demolition will save resources while minimising environmental impact. The following steps can be adopted for a successful and efficient soft strip demolition project.

Site survey

Ask your contractor to survey the site before planning the soft strip demolition process. It will help you identify all the reusable materials in the building. You will have ideas for reusing non-structural and undamaged elements like doors or windows.

Planning

Once you complete a site survey, create a detailed plan for the soft strip demolition. This plan will include stagewise planning. The detailed plan will help you avoid complications and compromise the safety of workers. The pre-demolition planning will involve a detailed plan to remove hazardous elements.

Asbestos removal

If your contractor has found a trace of asbestos in your old property, you must take careful measures to remove it from on-site. The contractor should be well versed in the guidelines of the Health and Safety Executives to remove asbestos from the site.

Stripping out fittings and fixtures

Next, remove all the non-structural elements from the old building. For example, remove the ceiling, lights, electrical wiring, carpets, doors, and windows. These elements are not part of the concrete body of the building; hence, they should be removed first. Removing non-structural walls The non-structural walls should be demolished once the elements mentioned above are removed from the building. Bricks from partitioning walls can be reused in the next phase of construction or refurbishment.

Challenges of soft strip out demolition

Like all construction works, soft strip demolition may also present some challenges. The challenges may look like the following:

Communication gap between you and the contractor - If you do not adequately communicate with your soft strip contractor, achieving project objectives may be difficult. Your contractor may also miss the project deadline.

Acquiring permits from the local government authority— In the UK, you must inform the local government authority if you plan to demolish a building. Adhering to specific norms may be required to get a permit.

Noise and dust pollution - One of the challenges you cannot avoid during the soft strip-out process. Your neighbours may find it unbearable and complain to the local authority.

Environmental impact - Soft strip-out may generate a mixture of scrap materials like plastic, wood, and metals. Separating one from another may be expensive. Hence, it might affect the environment. Possible solutions to resolve challenges

Increase communication— Communicate openly with your contractor to let him know your demands and expectations so that he can plan accordingly and achieve the project objectives.

Learn about rules and regulations - Increase your knowledge about relevant regulations for soft strip out in the UK. Environmental Protection Act 1990, Waste (England and Wales) Regulations 2011 and others play a crucial role in demolition and construction activities in the country.

Use modern machinery - Ask your contractor to use modern machinery to reduce noise and dust pollution. Some advanced machines collect dust particles at the source, reducing the spread of dust clouds. You can also ask your neighbours for a suitable time for the soft strip-out process. You can complete the work when they are not home.

Be more careful during soft strip out - Ask your contractor to be more cautious during the process. Try not to break concrete, metal and wood into small pieces so that separating and recycling them becomes difficult.

Conclusion

In conclusion, soft strip demolition is good for salvaging old construction resources. It promotes sustainability through a reduce, reuse, and recycle approach and can save on refurbishment costs. If you plan to demolish a building or soft strip an old building, contact Strip Out Company today! We aim to deliver bespoke soft strip solutions for our customers.